Down Payment Plan (DP Plan)
The most traditional structure: pay 10–15% at booking, then 80–90% within a short window — typically 45 to 60 days — well ahead of construction completion. In exchange for paying early, builders often offer a genuine price discount, sometimes up to around 10%, since they get funds fast and at low cost.
The trade-off: this plan puts the most risk on the buyer. If construction is delayed or a project runs into trouble, you've already parted with almost the entire amount with little built as security. It suits buyers with strong conviction in a specific builder's delivery track record, or those buying to negotiate the steepest possible discount.
Construction-Linked Plan (CLP)
The most common structure in the market today. You pay a booking amount, then instalments release in step with actual, verifiable construction milestones — foundation, each floor slab, terrace, application for Occupancy Certificate, and possession. You're only ever paying for what's physically been built.
A real, current example — Godrej Aveline in Yelahanka publishes its exact CLP schedule: 5% at booking, another 5% within 21 days, 10% within 90 days, then progressive instalments tied to the 3rd, 5th, 7th, 10th, 12th and 14th floor slabs and terrace/flooring stages, followed by 10% on OC application and the final 10% on possession notice. This is exactly the level of milestone detail worth asking for on any CLP you're shown.
CLP is generally considered the lowest-risk plan for the buyer, and it's also what most banks prefer, since loan disbursement can be matched directly to verified progress.
Possession-Linked Plan (PLP) — the 20:80 Plan
This is the plan most buyers mean when they ask about "20:80" — 20% paid at booking (usually within 90 days), and the remaining 80% due only on possession. Sobha City has run exactly this structure, marketed as a "20:80 Possession-Linked Payment Plan," typically offered on towers already at an advanced construction stage and scheduled for delivery within a relatively short window — which is an important detail: builders tend to offer aggressive possession-linked plans specifically on near-complete inventory, not on ground-floor-stage new launches.
PLP shifts almost all construction risk onto the builder — you're not exposed to delay risk on the bulk of your payment. It suits buyers who either don't need a home loan for most of the purchase, or whose loan is structured to disburse primarily at possession. It's less useful if you're relying on a loan throughout, since most lenders prefer disbursing against progress, not one large payment at the end.
Flexi Payment Plan
A genuine hybrid of the down payment and construction-linked approaches. A typical structure has the buyer pay roughly 50% of the total value around or before construction start, with the remaining 50% linked to construction progress from there. It offers a partial discount (smaller than a full DP plan) while still leaving some payment tied to actual progress. A reasonable middle ground for buyers who want some of the DP plan's savings without taking on its full risk.
Time-Linked Plan (TLP)
Easy to confuse with CLP, but structurally different and worth understanding clearly: a TLP ties instalments to the calendar, not to verified construction milestones — for example, fixed payments due at 6, 12, and 18 months from booking, regardless of how much has actually been built by then. This is meaningfully riskier than CLP for the buyer, since you're contractually obligated to pay on schedule even if the site has fallen behind. Always ask a builder directly whether a plan described as "phased" or "staged" is milestone-based (CLP) or date-based (TLP) — the difference matters.
The "1% Plan"
A newer, genuinely current structure worth knowing, since it's active on Bangalore launches today rather than being a textbook category. Godrej Properties has run a "1% Plan" on select Bangalore projects, where the buyer pays a small monthly percentage rather than large lump-sum instalments at each milestone — smoothing the cash-flow impact across many smaller payments instead of a few large ones. It's a variation on CLP in spirit (still tied to the project's overall payment schedule), but restructured for buyers who want predictability in smaller, regular amounts.
Bank Loan-Linked (Tripartite) Disbursement
This isn't a separate pricing structure so much as how CLP actually functions once a home loan is involved. The arrangement becomes tripartite — you, the builder, and the bank. The bank disburses your sanctioned loan amount directly to the builder at each verified construction milestone, rather than handing you the money to forward on. One detail worth knowing: your EMI is typically calculated on the full sanctioned loan amount once disbursement begins in earnest, not just the portion actually disbursed so far — factor this into your cash-flow planning rather than assuming EMIs scale with disbursed amount alone.
Subvention Schemes — A Necessary Caution
You may still hear this term, so it's worth addressing directly. Under a subvention scheme, the buyer paid a small amount upfront (often around 10%), and the developer covered the pre-EMI interest on the buyer's home loan until possession. It was genuinely popular before 2019 — and then the National Housing Bank effectively banned banks and housing finance companies from financing these schemes, after a pattern of complaints: buyers found themselves liable for interest payments the builder had promised to cover, particularly when projects were delayed beyond the subvention period specified in the fine print.
Bank-financed subvention is no longer generally available for new bookings as a result. What you may still encounter are builder-funded variants under different names — an "interest reimbursement" scheme, for instance, where the builder directly credits you an amount roughly equal to the EMI interest, rather than a formal tripartite subvention arrangement with a bank. These aren't illegal, but they deserve the same scrutiny that sank the original schemes: read exactly who is contractually liable if the project is delayed, and for how long the reimbursement commitment actually runs.
Quick Comparison
| Plan Type | Typical Structure | Risk Level |
|---|---|---|
| Down Payment (DP) | 10–15% booking, 80–90% within 45–60 days | Highest |
| Construction-Linked (CLP) | Booking + instalments per verified milestone | Low |
| Possession-Linked / 20:80 | 20% booking, 80% on possession | Low for buyer, needs cash-ready buyer |
| Flexi | ~50% before construction, rest milestone-linked | Moderate |
| Time-Linked (TLP) | Fixed calendar dates, regardless of progress | High |
| 1% Plan | Small monthly % instead of large milestone sums | Low–Moderate |
| Subvention / Interest Reimbursement | Low upfront, interest covered till possession | Depends heavily on fine print |
How Karnataka RERA Protects You, Whatever Plan You Choose
Regardless of which payment plan a project offers, Karnataka RERA requires developers to hold at least 70% of buyer funds collected for a project in a dedicated escrow account, usable only for that project's construction and land cost — not diverted to the developer's other projects or general business. This is a meaningful, structural protection that didn't exist before 2017, and it applies whether you're on a DP plan or a CLP. What it doesn't do is eliminate delay risk entirely, or protect you from a payment plan's own structural weaknesses — that part is still on you to evaluate.
How to Choose the Right Plan for You
- Buying largely self-funded, without a big loan? A possession-linked (20:80) plan minimises your exposure to construction delay risk.
- Relying on a home loan for most of the purchase? CLP generally works best, since banks prefer disbursing against verified progress rather than a single late lump sum.
- Want the steepest possible discount and trust the builder's delivery record? A DP plan may make sense — but only with a developer whose last few projects delivered close to on schedule.
- Uncertain about your cash flow timing? A flexi or 1%-style plan smooths the load into smaller, more predictable amounts.
Red Flags to Watch For
- A "discount" that's actually just a disguised down-payment plan with more risk than the discount is worth
- Vague milestone definitions in a CLP — "on completion of structure" should specify which floor/slab, not a broad phase
- Any plan asking for more than 40–50% of the total value before the plinth/foundation stage is complete
- A subvention or interest-reimbursement scheme with no clearly stated cap on how long the commitment runs if the project is delayed